Oct 2023-Feb 2024 - Darland Skidsteer - Howe Irrigation, Arco Idaho
Fusion of 30,000LF of 12” to 36” HDPE Pipe.
Aug 2023-Dec 2023- Excelsior Construction
Repair Entry & Install Lighting, Old Penitentiary, Idaho State Historical Society - DPW No. 17621
Demo existing concrete sidewalks, Prep existing gravel for new sidewalks. Installation of new seepage bed and all drainage vaults and pipe. Install 1/2" chips.
July 2023- Dept of Public Works -City of Boise - RSP-425 2052 Ridge Point Way
Pipeburst 165 LF of 6” sewer service, Install 6” clean out, Reconnect to existing service line, Install 48” man hole, Reconnect 8” sewer main. Patch asphalt as required.
June 2023-Current Sletten Construction, Boise ID—Walmart #2782-279 Mountain Home
Demo and remove concrete for new building. Demo and remove asphalt at construction location. All saw cutting for concrete and asphalt to be removed. Replace all paving at a 3" mat at maximum 5 feet in width. Excavate and backfill for all footings for new building. Prep for slab on floor. Prep for all sidewalk Installation of 6” Storm drain line.
May 2023-Current -Timberlake Construction, Bozeman MT— Bozeman 2023 Sewer Renovations
Pipeburst approximately 2000 LF of 10”-12” Diameter HDPE Pipe in various city locations using Groundburst 800G Pipe Bursting Tool. Scope includes pipe fusion, service connects, insertion pit excavations and backfill.
The work involves renovating existing sewer mains and manholes East Main Street, North Bozeman Avenue, South Church Avenue, East Babcock Street, and North Wallace Avenue, restoring impacted right-of-way to pre-existing conditions and all related work incidental to construction.
Also serving as consultant to Timberlake to train workers in pipe bursting and fusion scope.
November 2022-May2023 Altecca Construction, Boise ID— St Johns Vianney Additions
Excavation, Backfill, and road mix prep for footings. Installation of storm drainage and roof drain lines within 5 feet of building. Install new seepage bed in old roadway and modify existing seepage bed between buildings. Grub site as neccesarty and remove materials. Stockpile backfill as room allows on site. Remove all concrete, asphalt from existing site to prep for new buildings. Grade and prep for new concrete walks. Prep and Pave Asphalt as shown on contract drawings
December 2022-Iron Horse LLC — Boise City RSP-366 CIPP
Perform 150LF of 6” CIPP and 75LF of 4” CIPP Excavation of insertion pits, CIPP Lining, backfill of insertion pits, reinstatement of services after lining, paving restoration, & shoring as needed.
October 2022 Perigee Group, Boise ID— Senske TI
Perform demo and removal of existing concrete landing, electrical pad, concrete walk & curbs, approximately 800sf of existing lawn, and existing asphalt ramp. Fill and prep for new concrete and paving as required. Perform paving as required. Includes export of demoed materials and import of new.
May 2022-October 2022 Sletten Construction, Boise ID—Walmart #3879 Twin Falls
Excavation and installation of 4”service piping up to building. Install Only- 1500 Gal Green Turtle grease interceptor (Supplied by Sletten) Make tap into existing sewer main. Expose, cut and cap existing 4”sewer service. Demo external concrete slab. Install 6” of road mix and grade for new building. Prep and Paving
June 2022-July 2022 - Darland Skidsteer - Howe Irrigation, Arco Idaho
Fusion of 6500 LF of 36” HDPE Pipe.
March 2022 - City of Boise - 11th Street Manhole Replacement-RSP383
Removal and replacement of one existing manhole, approximately 50 L.F. of 8-inch diameter sewer main pipe, replacement of a sewer service line, and other related work.
March 2022 - Ada County Highway District - McMillan Rd, 300’ E/O Cortona Way-Project # MD-2762
Installing 28” Snap-Tite pipe inside a failing 30” culvert.
Jan 2022-Feb 2022 - Doyon Management - Building 2215, MHAFB
Perform 350lf of Blue-Light Cure in Place Pipe (CIPP) -Advanced Trenchless Technology. CCTV, Cleaning, & Reinstatements.
Dec 2021 —711 N. 20th St, Boise
Perform 20lf of 4” Blue-Light Cure in Place Pipe (CIPP) -Advanced Trenchless Technology
Dec 2021 —713 N. 20th St, Boise
Perform 68lf of 4” Blue-Light Cure in Place Pipe (CIPP) -Advanced Trenchless Technology
Dec 2021 City of Boise - 1708 Vista Ave RSP 395
Perform 86lf of 4” Blue-Light Cure in Place Pipe (CIPP) -Advanced Trenchless Technology
Sept-Dec 2021-American General Contractors Inc —City of Boise —FB 21-204-Small Diameter Sewer Rehab
Replace 230 LF of 4” Diameter Sewer Service Line, Pipeburst 95lf of 4” through 4” , 548lf of 8” through 8”. Install 8”x4” Service Reconnections. Install Manholes, Replace 8” diameter pipe with 8” Pressure Sewer Pipe.
Sept 2021 City of Boise—Highland View CIPP - RSP 348
Supply all materials, labor and equipment to provide CIPP Lining to Approx 100 LF of 4" pipe from clean-outs on the properties to the mainline in the street.
Aug 2021 City of Boise—S. Grant Street Sewer Extension -SFB 21-367
Installation of approximately 255 L.F. of 8-inch pressure sewer main, install service lines, manholes, and other related work.
June -Aug 2021 Sletten Construction, Boise ID—Walmart #2508-Overland Boise
Excavation and installation of 4”service piping up to building. Install Only- 1500 Gal Green Turtle grease interceptor (Supplied by Sletten) Make tap into existing sewer main. Expose, cut and cap existing 4”sewer service. Demo 2400sf of external concrete slab. Install 6” of road mix and grade for new building.
April/May 2021 D&A Companies—Employee Parking Lot Extension
Grade & Prep gravel parking area for future expansion and temporary employee parking
March-June 2021 Desert View Construction/City of Parma—Parma Wastewater Treatment Plant
Perform 6” Pipe Burst and excavation. Temporary Bypass. Excavation & Installation of Concrete Vaults for Champion Lift Station
May 2021 City of Boise—6-Inch Service Replacement Gowen Field Bldg #312
Installation of approximately 175 linear feet of existing 6-inch diameter clay (VCP) sewer service with a 4-inch diameter polyethylene pipe using a pipe bursting method of construction, reconnection to an existing 8-inch diameter clay (VCP) sewer main, installation of a new clean-out, and other related work.
Feb 2021 City of Buhl, Urban Renewal Agency—Sewer Service Rehabs
Rehab sewer services by means of Pipebursting-Connection to existing 4” Services to Main Line
Dec 2020- Jan 2021 City of Boise—Sewer Replace between 24th/25th Streets and Hazel/Bella Streets-(RSP-390), SFB 21-099:
Rehabilitation of approximately 285 linear feet 8-inch diameter sewer main using a pipe burst method, along with manholes, services, and other related work.
March 2020- Dec 2020 City of Boise—Small Diameter Sewer Rehab FY 2020(RSP-334), SFB 20-146:
Joint Venture with Wickham Pipeline Construction - Pipe bursting approximately 8,506 linear feet of 8-inch and 15-inch diameter sewer mains, rehabilitation of 275 linear feet 15-inch and 702 linear feet 18-inch diameter sewer mains using a cured-in-place method, along with manholes, services, and other related work.